Home | Business News | Browse by Publication | I |  IIE Transactions

IIE Transactions

Journal covering research in engineering.

Total result: 720 articles

Page 8 of 10 Next page of results

Performance evaluation of a make-to-stock production line with a two-p...
March 01, 2004

The analysis of feature-based measurement error in coordinate metrolog...
March 01, 2004

Value of information in remanufacturing complex products.
March 01, 2004

Data mining techniques applied to predictive modeling of the knurling ...
March 01, 2004

Back-of-the-envelope miniload throughput bounds and approximations.
March 01, 2004

Minimization of tool switches for a flexible manufacturing machine wit...
February 01, 2004

Algorithms for the model configuration problem.
February 01, 2004

Reducing cycle times in manufacturing and supply chains by input and s...
February 01, 2004

Multi-objective lot splitting for a single product m-machine flowshop ...
February 01, 2004

A mathematical programming model for global plant location problems: a...
February 01, 2004

Optimal solution methods for the minimum-backtracking row layout probl...
February 01, 2004

Real-time disruption management in a two-stage production and inventor...
February 01, 2004

A Bayesian stochastic programming approach to an employee scheduling p...
February 01, 2004

Parallel machine scheduling to minimize the sum of quadratic completio...
January 01, 2004

An improved algorithm for solving a multi-period facility location pro...
January 01, 2004

Optimal capacity expansion for multi-product, multi-machine manufactur...
January 01, 2004

Managing two-stage serial inventory systems under demand and supply un...
January 01, 2004

An industrial extension of the discrete lot-sizing and scheduling prob...
January 01, 2004

Multi-product inventory planning with downward substitution, stochasti...
January 01, 2004

Batching in a two-stage flowshop with dedicated machines in the second...
January 01, 2004

Some results on resource constrained scheduling.
January 01, 2004

Exact algorithms for the job sequencing and tool switching problem.
January 01, 2004

Using parameter prediction models to forecast post-interruption learni...
December 01, 2003

Cost-variability-sensitive preventive maintenance considering manageme...
December 01, 2003

On the effect of redundancy for systems with dependent components.
December 01, 2003

Performance measures for a single-change-point nonstationary control c...
December 01, 2003

Element availability importance in generalized k-out-of-r-from-n syste...
December 01, 2003

Percentile life and reliability as performance measures in optimal sys...
December 01, 2003

Time Series: Applications to Finance.(Book Review)
December 01, 2003

The buyer-vendor coordination problem: modeling inbound and outbound c...
November 01, 2003

A sequential bounding approach for optimal appointment scheduling.
November 01, 2003

The minimax and maximin location problems on a network with uniform di...
November 01, 2003

On the relation between the benefits of risk pooling and the variabili...
November 01, 2003

Managing fashion goods inventories: dynamic recourse for retailers wit...
November 01, 2003

Optimal shift scheduling with a global service level constraint.
November 01, 2003

The benefits of flexible production rates in the economic lot scheduli...
November 01, 2003

Production and distribution lot sizing in a two stage supply chain.
November 01, 2003

Position announcement: editor--The Engineering Economist.
November 01, 2003

Optimizing prototyping effort with an evolving product design.
October 01, 2003

Development and pilot testing for virtual manufacturing tools with int...
October 01, 2003

Optimal production control problem in stochastic multiple-product mult...
October 01, 2003

Greedy tool heuristic approach to rough milling of complex shaped pock...
October 01, 2003

Analysis of workflow protocol adaptability in TestLAN production syste...
October 01, 2003

Optimization-based manufacturing scheduling with multiple resources, s...
October 01, 2003

Accounting for parameter uncertainty in simulation input modeling.
September 01, 2003

Robust optimization of experimentally derived objective functions.
September 01, 2003

Designing an assembly process with stochastic material arrivals.
September 01, 2003

Price competition of make-to-order firms.
September 01, 2003

Market design and human trading behavior in electricity markets.
September 01, 2003

Enhanced simulation inference using bootstraps of historical inputs.
September 01, 2003

Competition, learning and investment in new technology.
September 01, 2003

Replicative use of an external analytical model in simulation variance...
September 01, 2003

The optimal admission and dispatching control policy of a two-terminal...
September 01, 2003

A synthesis of tactical fleet planning models for the car rental indus...
September 01, 2003

Generalized Linear Models With Applications in Engineering and the Sci...
September 01, 2003

Building and Solving Mathematical Programming Models in Engineering an...
September 01, 2003

Operations Research Models and Methods.(Book Review)
September 01, 2003

Control of a batch processing machine serving compatible job families.
August 01, 2003

Optimal inventory policy for systems with demand cancellations.
August 01, 2003

The value of processing flexibility in multipurpose machines.
August 01, 2003

An economic lot size model for perishable products with age-dependent ...
August 01, 2003

Using ant techniques to solve the assembly line balancing problem.
July 01, 2003

Determining the importance weights for the customer requirements in QF...
July 01, 2003

A hybrid inventory system with a time limit on backorders.
July 01, 2003

Robust designs for quality improvement.
June 01, 2003

Efficiently solving the redundancy allocation problem using tabu searc...
June 01, 2003

Multi-state consecutive-k-out-of-n systems.
June 01, 2003

Investing in quality under autonomous and induced learning.
June 01, 2003

An error rate comparison of classification methods with continuous exp...
June 01, 2003

Bootstrap Methods: A Practitioner's Guide. (Book Reviews).(Book Review...
June 01, 2003

Categorical Data Analysis, Second Edition. (Book Reviews).(Book Review...
June 01, 2003

Box on Quality and Discovery with Design, Control, and Robustness. (Bo...
June 01, 2003

Reliability of Computer Systems and Networks Fault Tolerance, Analysis...
June 01, 2003

On assemble-to-order systems with flexible customers.
May 01, 2003

Total WIP and WIP mix for a CONWIP controlled job shop.(Work-In-Proces...
May 01, 2003

Page 1|2|3|4|5|6|7|8|9|10 Next page of results