Home | Business News | Browse by Publication | I |  IIE Transactions

IIE Transactions

Journal covering research in engineering.

Total result: 695 articles

Page 7 of 10 Next page of results

Extending economic design of p charts to handle user specified constra...
September 01, 2004

Determining measurement error requirements to satisfy statistical proc...
September 01, 2004

Online automatic process control using observable noise factors for di...
September 01, 2004

Wavelet-based multiscale statistical process monitoring: a literature ...
September 01, 2004

Variation transmission analysis and diagnosis of multi-operational mac...
September 01, 2004

Inspection schemes for general systems.
September 01, 2004

Integration of dimensional quality and locator reliability in design a...
September 01, 2004

Cumulative conformance count chart with sequentially updated parameter...
September 01, 2004

A likelihood-ratio-based EWMA control chart for monitoring variability...
September 01, 2004

Subcontracting with availability guarantees: production control and ca...
August 01, 2004

A throughput model for carousel/VLM pods.
August 01, 2004

Batch size modeling in a multi-item, discrete manufacturing system via...
August 01, 2004

Performance analysis of production systems with rework loops.
August 01, 2004

Robust reverse production system design for carpet recycling.
August 01, 2004

A statistical approach to tolerance evaluation for circles and cylinde...
August 01, 2004

Erratum.(Correction Notice)
July 01, 2004

Demand point aggregation analysis for a class of constrained location ...
July 01, 2004

Parallelism of continuous- and discrete-time production planning probl...
July 01, 2004

Economic lot scheduling with lost sales and setup times.
July 01, 2004

A cyclic policy for the loading of multiple products on a vehicle with...
July 01, 2004

Two-echelon spare parts inventory system subject to a service constrai...
July 01, 2004

Stability and resource allocation in project planning.
July 01, 2004

Capacitated multicommodity network flow problems with piecewise linear...
July 01, 2004

Order selection and scheduling with leadtime flexibility.
July 01, 2004

Replacement under ongoing technological progress.
June 01, 2004

A time-predefined local search approach to exam timetabling problems.
June 01, 2004

Make-to-order, make-to-stock, or delay product differentiation? A comm...
June 01, 2004

Simulation in dynamic environments: optimization of transportation ins...
June 01, 2004

A simulation-based learning automata framework for solving semi-Markov...
June 01, 2004

Monopoly pricing when customers queue.
June 01, 2004

The effect of discreteness in vendor-buyer relationships.
June 01, 2004

A survey of recent advances in discrete input parameter discrete-event...
June 01, 2004

Economic design of a variable sampling rate EWMA chart.
May 01, 2004

Statistical process control via context modeling of finite-state proce...
May 01, 2004

A cautious minimum variance controller with ARIMA disturbances.
May 01, 2004

Multiresponse systems optimization using a goal attainment approach.
May 01, 2004

Optimization design of control chart systems.
May 01, 2004

An upper bound on the weight-balanced testing procedure with multiple ...
May 01, 2004

Human performance reliability: on-line assessment using fuzzy logic.
May 01, 2004

Algorithms to determine the threshold reliability of flow networks.
May 01, 2004

Data Mining: Concepts, Models, Methods, and Algorithms.(Book Review)(B...
May 01, 2004

The effect of categorizing returned products in remanufacturing.
April 01, 2004

Unrelated parallel machine scheduling with job splitting.
April 01, 2004

A reinforcement learning approach to stochastic business games.
April 01, 2004

Loading and unloading operations in container terminals.
April 01, 2004

Domicile selection and risk pooling for trucking networks.
April 01, 2004

Production planning for medical devices with an uncertain regulatory a...
April 01, 2004

The effectiveness of investment in lead time reduction for a make-to-s...
April 01, 2004

Can the desired service level be achieved when the demand and lost sal...
April 01, 2004

Methods for processing and prioritizing customer demands in variant pr...
March 01, 2004

Performance evaluation of a make-to-stock production line with a two-p...
March 01, 2004

The analysis of feature-based measurement error in coordinate metrolog...
March 01, 2004

Value of information in remanufacturing complex products.
March 01, 2004

Data mining techniques applied to predictive modeling of the knurling ...
March 01, 2004

Back-of-the-envelope miniload throughput bounds and approximations.
March 01, 2004

Minimization of tool switches for a flexible manufacturing machine wit...
February 01, 2004

Algorithms for the model configuration problem.
February 01, 2004

Reducing cycle times in manufacturing and supply chains by input and s...
February 01, 2004

Multi-objective lot splitting for a single product m-machine flowshop ...
February 01, 2004

A mathematical programming model for global plant location problems: a...
February 01, 2004

Optimal solution methods for the minimum-backtracking row layout probl...
February 01, 2004

Real-time disruption management in a two-stage production and inventor...
February 01, 2004

A Bayesian stochastic programming approach to an employee scheduling p...
February 01, 2004

Parallel machine scheduling to minimize the sum of quadratic completio...
January 01, 2004

An improved algorithm for solving a multi-period facility location pro...
January 01, 2004

Optimal capacity expansion for multi-product, multi-machine manufactur...
January 01, 2004

Managing two-stage serial inventory systems under demand and supply un...
January 01, 2004

An industrial extension of the discrete lot-sizing and scheduling prob...
January 01, 2004

Multi-product inventory planning with downward substitution, stochasti...
January 01, 2004

Batching in a two-stage flowshop with dedicated machines in the second...
January 01, 2004

Some results on resource constrained scheduling.
January 01, 2004

Exact algorithms for the job sequencing and tool switching problem.
January 01, 2004

Using parameter prediction models to forecast post-interruption learni...
December 01, 2003

Cost-variability-sensitive preventive maintenance considering manageme...
December 01, 2003

On the effect of redundancy for systems with dependent components.
December 01, 2003

Page 1|2|3|4|5|6|7|8|9|10 Next page of results