Home | Business News | Browse by Publication | E |  EE-Evaluation Engineering

EE-Evaluation Engineering

Click on article title to view & purchase. Articles are sorted by their publication date in reverse chronological order.

Can we be sure?
December 01, 2009

DAC interleaving in ultra-high-speed Arbs.
December 01, 2009

3-D X-Ray inspection looks into the void.
December 01, 2009

Approaching board test nonintrusively.
December 01, 2009

Implementing "extreme" customer service.
November 01, 2009

Hardware-in-the-loop testing for hybrid vehicles.
November 01, 2009

Understanding star switching.
November 01, 2009

Scope probes with attitude.
November 01, 2009

Protocol analysis in a scope.
November 01, 2009

Specialized EMC signal generators.
November 01, 2009

Modifying the MARK 6 guidance system.
October 01, 2009

Implementing a boundary scan methodology.
October 01, 2009

Building the 4G foundation.
October 01, 2009

Centrifuge DAQ system reinforces New Orleans levees.
October 01, 2009

The engineers of tomorrow.
October 01, 2009

Baseband module reduces multisite test costs.
October 01, 2009

Design and development testing.
September 01, 2009

Fast channels make light work.
September 01, 2009

Acoustic evaluation of heat sink integrity.
September 01, 2009

Customer demand draws suppliers into LXI camp.
September 01, 2009

Leveraging test data as a strategic management tool.
August 01, 2009

Design and development testing.
August 01, 2009

Resolving test challenges for high-speed interfaces.
July 01, 2009

IEEE 1149.7 expands JTAG functionality.
July 01, 2009

Multifunction DAQ modules integrate and diversify.
July 01, 2009

Why not a personal base station?
June 01, 2009

Standards help ensure order for nanotechnology.
June 01, 2009

Sooner, not later.
May 01, 2009

The rest of the story.
May 01, 2009

Introducing the CNO.
May 01, 2009

RF measurements of electromechanical relays.
April 01, 2009

Security trumps salary for today's engineers.
April 01, 2009

Boldly going beyond S-parameters.
April 01, 2009

Advances in testing embedded systems.
April 01, 2009

IEEE 1588 to transform timing synchronization.
April 01, 2009

Strengthen the strong.
March 01, 2009

Optimize HALT results with best practices.
March 01, 2009

With Digitizers, the little bits count.
March 01, 2009

AOI-AXI duo improves product yield.
March 01, 2009

Seam aperture leakage in aerospace enclosures.
March 01, 2009

Open tools and standards emerge for embedded instrumentation.
February 01, 2009

Sales engineers are still engineers.
February 01, 2009

USB 3.0 physical layer measurements.
January 01, 2009

Selecting your optimum LXI feature set.
January 01, 2009

Can you really measure 154.263 ps?
January 01, 2009

To help you stay informed.
January 01, 2009

Nano-measurements need mega-care.
December 01, 2008

The importance of antenna calibration.
December 01, 2008

Emerging Synthetic Instruments and IVI driver solutions.
December 01, 2008

It's the economy.
December 01, 2008

Navigating the outsourcing options.
November 01, 2008

Digital is a state of mind.
November 01, 2008

Of biomarkers and biosensors.
November 01, 2008

It's fast and mostly green.
October 01, 2008

The drive for improved performance.
October 01, 2008

Tackling next-generation RF SOC test.
October 01, 2008

Extended analyzer capabilities blur distinctions.
October 01, 2008

Satellite testing demands RF link emulation.
October 01, 2008

Exploring AOI and X-Ray.
October 01, 2008

Systems EMC design and analysis.
October 01, 2008

Test set performs high-speed radio-layer measurements.
September 01, 2008

Women in Engineering.
September 01, 2008

Are LXI and Ethernet-enabled instruments the same?
September 01, 2008

Be (time) aware.
September 01, 2008

The killer Bs are coming.
September 01, 2008

The strong keep getting stronger.
July 01, 2008

Maximizing throughput and accuracy: a tutorial.
July 01, 2008

Note taking on the wane.
June 01, 2008

Mobility performance testing.
June 01, 2008

Life after VB 6.
June 01, 2008

Cross-bus analysis speeds troubleshooting.
June 01, 2008

Designing a company ready for any given Tuesday.
May 01, 2008

The art and science of reliability.
May 01, 2008

Signal switching via plug-in cards.
May 01, 2008

The colorful world of noise.
May 01, 2008